Know what to ask before the surface closes.

Straight answers about project scope, estimates, residential and commercial paving, groundwork and site information.

Surface decisions

Should asphalt be repaired, resurfaced or replaced?

The choice depends on whether distress is localized, primarily surface-led, or connected to widespread movement, base failure, drainage or unsuitable elevations. A site assessment is needed before selecting the treatment.

Can a gravel driveway or yard be paved?

It can be considered after the existing material, stability, grade, drainage, traffic and desired paved limits are understood. Existing gravel should not automatically be assumed to be a complete paving base.

Why do cracks return after repairs?

Cracks can reflect movement, joints, water or failure below the repaired surface. A patch may address the opening without eliminating every contributing condition.

Estimate and project information

What information helps with an estimate?

The address, current surface, intended use, visible failures, drainage concerns, access restrictions and approximate area if known create a useful starting point.

Why is the property address required?

The address helps distinguish residential, agricultural, rural and commercial conditions and supports a more relevant follow-up conversation.

Does the website provide a guaranteed paving price?

No. Site preparation, access, water, base condition, traffic, transitions and paving limits must be understood before a project-specific estimate can be developed.

Farm and commercial paving

What should a farm paving request include?

Describe heavy vehicles, turning areas, current gravel or asphalt, ditches, culverts, wet-season conditions, shoulders, long access routes and desired timing.

Can parking-lot work be phased around operations?

Some projects may be organized into work zones, but feasible phasing depends on property layout, access, traffic, tie-ins and the proposed scope.

Permits and service boundaries

Does road or right-of-way work require permits?

It may. Municipal, highway, public-right-of-way and traffic-control requirements depend on the exact site and work boundary and should be confirmed before work proceeds.

When can City approval affect driveway paving?

The City says a Highway Excavation Permit is required when work disturbs a City road or right-of-way, including certain driveway installations, replacements, extensions and pavement restoration. Work boundaries should be confirmed before construction is scheduled. See the City permit guidance.

Why does stormwater matter for an asphalt project?

The City identifies asphalt, parking lots and driveways as impervious surfaces. A paving plan should account for where runoff travels, how low points drain and whether an approved on-site system or public-side coordination applies. See the City stormwater guidance.

How is service availability confirmed?

The property address and proposed scope are used to confirm current coverage, scheduling fit and whether a project requires specialist or public-side coordination.

Next question

What does the property need to do?

Start with the address, current surface and intended use.

Build a paving request →